Operations Engineer - Cebu
Salary undisclosed
Apply on
Original
Simplified
Responsible for the day-to-day technical operations of facilities/network assets from sources to distribution and ensure operational efficiency, continuous business operations and compliance with regulatory bodies. He/she will also be responsible in integrating performance goals with budget and financial resources to effectively operate the project sites.
Description Of Functions
Description Of Functions
- Water Quality and Sufficiency -- 24/7 assurance of water sufficiency and portability.
- Water Disinfection -- Make sure that chlorinator pump is working properly and to immediately report /replace defective unit. Make sure that the chlorinator room and chlorine tank are cleaned regularly. Regular monitoring of chlorine residual.
- Water Sampling and Potability Physical and Chemical water test should be done twice a year (January and July) or as needed. Microbiological Water test must be done every first week of the month. Monthly application of Certificate of Potability.
- Water Tank cleaning. -- Water storage tanks must be cleaned at least twice a year.
- Regular blow-off and cleaning of filter. Monthly water blow-off along the main waterline, weekly blow-off and cleaning from the filter.
- Water level and flow rate monitoring -- Conduct a measurement of water level and actual flow rate of water from the deep well on a quarterly basis.
- Maintenance of site office, water tank and pump area. -- To maintain the cleanliness and orderliness of site offices, water tank and pump area.
- System's Loss -- Monitoring of allowable NRW.
- Flow Meter and Electric Meter Reading -- Regular monitoring of flow meter reading and the electric meter reading done by the site personnel.
- Leak detection and repair -- Immediately repair all visible leaks within 24 hours. To conduct leak detection if there are suspected leaks based on the flow meter reading.
- Replacement of defective meters. -- Investigate defective flow meters and individual water meter, then replace immediately to ensure a more accurate readings.
- Materials Requisition -- Maintain sufficient number of materials and fittings to be used for emergency repairs.
- Administrative
- Regular submission of Report -- Submit weekly and monthly report on the monitoring of flow meter and electricity meter. Monthly submission of water line leak repairs.
- NWRB Monitoring Report -- Quarterly submission of report as required by NWRB.
- Monitoring of active accounts. -- Monthly monitoring of new and active accounts and to report to bulk water supplier.
- NWRB CPC Application -- Provide the necessary information, data and plans for CPC application or renewal.
- Customer Service / After Sales Services -- Site complaints must be acted upon within 24 hours. Communicate with the LGUs and NGOs if required by the office.
- Others
- Hydrotesting and pipe laying inspections -- Regularly inspect pipe laying during construction period and to issue a certification for the 50% and 75% accomplishment or as needed for contractor's billing. To conduct hydrotesting as final requirement prior to 100% billing and final turnover to CWSI.
Similar Jobs